Answering how long a connection takes is like answering “how long is a piece of string”. It varies. For connections in general, it depends on the rig and the rig crew. For connections with MPD, it also depends on how constant the bottom hole pressure needs to be and which MPD method is used. Connections with MPD are generally slower because the pressure needs to remain constant when the circulation stops – and starts again.
Check out: 11 Things All Drilling and Completion Engineers Need to Know About MPD
Both SBP and CML aim to manage BHP consistently by compensating for the friction loss when circulation stops before the connection. The process in each case involves a gradual transition:
In both cases the pumps are gradually ramped down, and up, to ensure the MPD methods can maintain the desired BHP. While SBP allows for relatively quick adjustment with the surface choke provided the PID settings are correctly set, CML’s adjustment speed is dependent on how large the compensation is, and the density of the fluid being used.
Generally speaking; a surface choke can adjust the BHP faster than by adjusting the fluid level.
Read more: MPD Methods: Pros and Cons of CML vs SBP
While both methods can hold a constant BHP their approach is different.
The lower density used with SBP requires back-pressure to always be applied for all non-circulating operations to stay overbalanced. CML is statically overbalanced and needs to adjust the fluid level in the riser when the ECD gets too high.
Moreover, CML offers greater flexibility: if only the last part of the section has narrow margins it can start off with conventional connections and then gradually start holding constant BHP when approaching the area with narrow margins. This reduces overall connection times significantly.
CML can use the Dual Gradient Effect to effectively drill the upper parts of the well without needing to hold a constant BHP. The unique pressure profile generated when lowering the riser level, especially for deepwater operations, enables connections without pressure adjustments in narrow windows throughout the section.
Additional reading: How Does CML MPD Work?
Determining which method – SBP or CML – is more effective depends heavily on operational context, including:
In summary:
While neither method is universally superior, understanding their differences can help operators choose the most efficient strategy for each section of the well.