Skip to content

Applications

Explore the key challenges in modern offshore drilling and see how Enhanced Drilling’s solutions help operators improve performance, reduce risk, and enhance well integrity.

Pressure Management
Staying within the window
Well Completion
Finishing strong – safely and productively..
Deepwater & Ultra-Deepwater
More depth. More risk. More need for control.

Precision Tools That Enable Safer, Smarter Wells

Our technologies are categorized by drilling phase – helping you find the right solution faster.

Well Diagram - Top Hole Section

Top-Hole Section

Technologies
Help you drill faster, cleaner, and safer from day one — while protecting the environment and reducing risk in the most fragile part of the well.
Well Diagram - Intermediate Section

Intermediate section

Technologies
Helps you drill deeper with fewer casing strings, improved stability, and better safety — even in narrow pressure windows.
Well Diagram - Reservoir & Completion Section

Reservoir and Completion

Technologies
Helps maximize production rates, protect the reservoir, and simplify completion — even in depleted zones or challenging formations.
Enhanced DrillingSep 28, 2022

How we work - with you

Although all of our projects are unique and adapted to our clients' needs, there are certain steps we go through that all of our clients can expect when working with us.

Untitled design(4)-1

Well evaluation

 

After the first contact has been made, Enhanced Drilling will send out a “Well information datasheet” in order to gather all necessary information about the well. We use this information to ensure that the right system and tools are put together for the client needs. For EC-Drill® projects, Enhanced Drilling can also do a preliminary well evaluation using licensed software to evaluate what benefits can be achieved by utilizing the system.


Rig visit

In order to ensure a seamless installation of the system, we perform a site survey of the rig. The survey is documented by a report and shared with the client. Enhanced Drilling has been mobilized to most rigs in Europe, and in cases where it is less than six months since the last mobilization, a physical survey might not be necessary.

Untitled design(3)

 

Project planning and documentation

When all data has been collected and evaluated, Enhanced Drilling appoint a project team lead by the Project Manager. We will now start to plan the job together with you as a customer. The planning includes participating in DWOP (Drill Well On Paper) meetings, testing and packing the equipment, making detailed operations procedures, and engineering.

Enhanced Drilling has an inhouse engineering department with multidiscipline capacity including design engineering and drilling engineers.

 

Shipment and installation

When the equipment is tested and packing is completed, it is sent to the Company’s dedicated supply base for mobilization on the rig. When ready, the offshore team is mobilized to start installing the system. After the system is installed on the rig, we perform a final commissioning before we are ready for operation.

 

Post-job report

After the job is completed, the Project Manager compiles and delivers a post-job report where the job is evaluated and measured to assess how well the success criteria for the job have been met. We go through all aspects of the well where we have been involved, and fully contribute to all after-action processes.

We complete the job by inviting the client to rate the performance of our job from start to finish by sending out a one-page grading sheet covering all phases of the job.

Find out more or get in in touch with one of our experts.

 

 

Download What to Expect